IXOM Chlorine Liquefaction Plant
CLIENT:
IXOM Operations Pty Ltd
COMPLETED:
30 July 2026
INDUSTRY:
Industrial
Project Details
IXOM, Australia’s sole domestic supplier of liquefied chlorine for water treatment, sought approval to modify its existing State Significant Development (SSD) consent to construct a backup chlorine liquefaction plant in Botany. This facility aims to ensure a continuous, secure supply of chlorine in case of outages at IXOM’s primary Laverton plant in Victoria. The new plant will integrate with existing chlor-alkali processes and is designed to operate at a reduced rate under normal conditions, with capacity to scale in emergency scenarios.
Element Engagement
Element was engaged to prepare a comprehensive scoping report to obtain the Secretary’s Environmental Assessment Requirements (SEARs) for the proposed modification. Element’s scope of work included:
- Strategic planning analysis and justification for the proposal.
- Environmental impact scoping across hazards, traffic, amenity, air quality, and stormwater.
- Coordination of stakeholder engagement, including agency and community consultation.
- Technical assessment coordination (QRA, PHA, air and noise modelling).
- Integration of regulatory, heritage, and contamination contexts.
- Preparation and submission of the final scoping report in compliance with EP&A Act Section 4.55(2).
Project Achievements
Element leveraged its multidisciplinary expertise to deliver a well-structured, evidence-based scoping report that:
- Clearly demonstrated the national strategic importance of the proposal.
- Addressed community safety through robust risk mitigation strategies, including a purpose-built containment building and advanced scrubbing systems.
- Highlighted the project’s contribution to reducing transport emissions by localising chlorine supply for NSW.
- Ensured early engagement with key stakeholders including Sydney Water, SafeWork NSW, Bayside Council, and the Botany Industrial Park community.
Facilitated a smooth pathway for the next stage of assessment by anticipating key agency concerns and cumulative impact considerations.